After a leak, the surfaces dry fast while the structure stays wet. Framing, subfloors, and wall cavities hold moisture you cannot see. Structural drying uses measured airflow and dehumidification to bring those materials back to normal moisture levels.
Free referral to independent, licensed and insured local pros. Zip codes served include 72734.

We are a referral line, not a contractor. Calls are routed to independent local pros around Gentry who treat drying as a measured process with daily readings and written logs.
LGR dehumidifiers, desiccants for tough jobs, and air movers placed with purpose, not just pointed at the wall.
Daily logs track humidity and material readings so drying decisions are based on data.
Each contractor runs an independent, licensed and insured business. Confirm both with the pro before equipment is set.
You will see equipment day rates and an estimated drying timeline before setup.

The goal is simple: get every wet material back to the moisture level of similar dry materials in the house, and prove it with readings.

Pin and pinless meters plus an infrared camera show exactly where water traveled, including under cabinets, inside walls, and across the subfloor.
Sealing off the wet area with plastic focuses the equipment and shortens drying time.
Injecting dry air through small holes can dry wall cavities without full flood cuts.
Hardwood and subfloors are dried with mats and controlled airflow to reduce cupping.
Drying ends only when readings confirm the structure is dry, and you get the log for your records.
Tell the dispatcher when the leak happened and what has been done so far.
The pro arrives with moisture meters, infrared camera, and drying gear.
You get a moisture map, a dry standard baseline, and a written drying plan with costs.
Equipment runs with daily readings and adjustments until every material reaches dry standard, then it is removed and the log is handed over.
Get readings before you rebuild.
We had fans running for a week after a leak and it still smelled. The drying contractor found wet studs with a thermal camera and had them dry in four days with real equipment.
Laura F.Hidden wet framing after leakWall injection drying saved our drywall. Just a few small holes behind the baseboards.
Kevin Y.Wall cavity dryingI liked seeing the daily log. Humidity numbers, wood readings, all of it. The adjuster liked it too.
Mariah S.Insurance drying documentationThey saved our cupping hardwood with floor mats and patient drying.
Henry L.Hardwood floor drying

Typically three to five days, longer for hardwood, plaster, or concrete.
Consumer equipment is too weak to dry framing quickly enough to prevent mold.
It is the baseline moisture reading of dry materials in your house. Wet materials are dried until they match.
Grains per pound, or GPP, measures how much water vapor is in the air. Lowering GPP in the drying area speeds evaporation from wet materials.
It is loud and warm. Closing off the drying area helps at night.
No. We connect you with independent local pros. Confirm their license and insurance before work starts.

Calls from Gentry and zip codes such as 72734 are routed to structural drying pros working locally.
Nearby cities are listed below.
